AGENDA MEMORANDUM

 

 

MEETING DATE:   December 14, 2009

 

FROM:                       Mike Thornton, Purchasing Manager

 

SUBJECT:                  Resolution authorizing the execution of an agreement with Marlon Dunn Contracting, Inc. for conversion of an Effluent Transmission Main

 

 

Staff Recommendation:

Staff recommends approval of the resolution authorizing execution of an agreement with Marlon Dunn Contracting, Inc. to provide construction services for a total amount of $383,232.20.

 

Analysis:

The purpose of this project is to convert an existing effluent (waste water) main to a pressurized reuse water (irrigation) main.  A non-pressurized 20-inch effluent main running from the Canal Street WTF to the Turnpike WTF was installed in the 1980’s.  This main operates at a very low pressure.  In order for this main to be used for reuse water the pressure must be increased.

 

The pressurization and control of the pressure will be accomplished with the installation of additional equipment to include a new pressure-sustaining-valve, flow meter station, associated piping, valves, fittings, pre-cast concrete vaults, and hatches.

 

There are two critical areas that must be reinforced to protect against leaks and line breaks.  The main crosses under US Highway 441 at Canal Street and US S.R. 27 at Vine Street, a High Density Poly Ethylene liner will be installed in the existing ductile iron pipe in these sensitive areas to avoid any possibility of washouts under these major roadways should the joints of the existing line fail.  This process essentially involves inserting a plastic folded liner into the ductile iron pipe.  The liner is unfolded and expanded with heat.  The area between the liner and the pipe is sealed to prevent leaks between the pipe and liner.  This specific method of reinforcing these areas was clearly defined in the technical bid specifications.

 

The completion of this project will provide reuse water to existing customers between Canal and Vine Streets.  Reuse water passing through the pressure sustaining valve located at Vine Street will continue to flow to the Turnpike WTF spray field.

 

Procurement Information:

On September 21, 2009, the Purchasing Division issued Invitation to Bid number 90451.  Notification of this opportunity by legal advertisement in the Daily Commercial was made.  As well as posting on-line at BidSYNC.com.

 

On October 20, 2009, sealed bids were received from three prospective contractors.  Bids were evaluated by both the purchasing staff and the engineer of record on the project, AECOM, USA.  Project references provided by the two lowest bidders were verified by the engineer. 

 

The engineer’s research of the bid information and references revealed the initial low bidder, Prime Construction, sought to provide an alternative method of lining the ductile iron pipe.  The alternative method was unacceptable to the City.  Following the determination Prime Construction’s bid was unacceptable the firm was eliminated from further consideration resulting in Marlon Dunn becoming the lowest priced offeror.

 

The engineer has recommended award to Marlon Dunn Contracting, Inc. as the lowest responsive and responsible bidder.  City staff concurs with the recommendation of the engineer.

 

SUMMARY OF BIDS

 

BIDDER NAME

LOCATION

AMOUNT

Responsive & Responsible

Marlon Dunn Contracting, Inc.

Plant City

$383,232.20

YES

Superior Asphalt of Central Florida

Mt. Dora

$418,405.00

YES

Prime Construction Group, Inc.

Orlando

$237,930.00

NO

 

The Local Business Enterprise (LBE) preference was not a factor in this bid evaluation.  The applicable 1% preference would have required a local vendor to submit a bid of no more than $387,064.52.  Only Superior Asphalt of Central Florida qualified as a LBE.

 

Options:

1.  Approve execution of the agreement with Marlon Dunn Contracting, Inc.; or

2.  Such alternative action as the Commission may deem appropriate.

 

Fiscal Impact:

There is $384,753 budgeted and remaining for this project in the 2007 Bond funds.  These funds will be rolled from FY 2008-09 to the current fiscal year.

 

Submission Date and Time:    12/10/09 5:13 PM____

Department: . Water_____

Prepared by: _ Terry Pollard_________                 

Attachments:  Yes__X__   No ________

Advertised:   _X___ Not Required __ ___                     

Dates:   _   9/20/09             _____     _____                     

Attorney Review:   Yes ____  No _ X__

 

_______________________________

Revised 6/10/04

 

Reviewed by: ___________________

Finance  Dept. _____JB___________                                                   

Deputy C.M. ___________________                                                                         

Submitted by:

City Manager ___________________

 

Account:      __043-3099-533.63-10___

 

Project No.  _ 430012____________

 

WF No.        _WF0483649 / 001___

 

Budget :       __$384,753__________

 

Available:     __ $384,753_        _______

 

 

 

 

 

 

 

 

 

 

RESOLUTION NO._______________

 

A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF LEESBURG, FLORIDA, AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN AGREEMENT WITH MARLON DUNN CONTRACTING, INC. FOR EFFLUENT TRANSMISSION MAIN CONVERSION CONSTRUCTION SERVICES FOR $383,232.20; AND PROVIDING AN EFFECTIVE DATE.

 

BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF LEESBURG, FLORIDA:

 

            THAT the Mayor and City Clerk are hereby authorized to execute an agreement with MARLON DUNN CONTRACTING, INC. whose address is P.O. Box 1357, 3115 W. Sammonds Road, Plant City, Florida 33567 for pond, ditch and right-of-way mowing services pursuant to Invitation to Bid 90451.

 

             THAT this resolution shall become effective immediately.

 

PASSED AND ADOPTED by the City Commission of the City of Leesburg, Florida, at a regular meeting held the _14th____ day of _December________ 2009.

 

 

 